30 years experience in roof refurbishments has taught us a lot. We have developed a highly effective attic reconstruction process. Whether you choose a dormer, a hip to gable or a mansard attic extension the process is pretty much the same.

We don’t believe in cutting corners. We deliver value for money. Our process ensures your attic reconstruction is of the highest standards and will be constructed in the shortest possible time.

How you benefit from our process:

  • Fast approval of plans
  • Quality assured
  • Quick completion
  • No costly mistakes or setbacks
  • Adherence to health and safety procedures
  • Minimum disruption to your family

Wandsworth Lofts: Our 8 step attic extension process

We don’t try to blind you with science or bog you down in technical jargon. Weprovide a simple explanation of our roof refurbishment process. Of course if you would like further information on our process, we are more than happy to go into greater detail. At your convenience.

1. Free consultation and quote

We meet your family and take a look at what is under your roof. You describe your vision and expectations. We share our gallery of completed projects.

2. Design and draw plans

Our experts get cracking on designing your new construction and draw up the plans for it.

3. Prepare and begin construction

Alarmed scaffolding is set up in preparation for your roof renovation. We create a gap in your roof. By doing most of our work via this gap you experience the least inconvenience possible. The gap is covered at night, so no need to worry about burglars or bad weather. This gap will remain in place for around 3 weeks.

Materials begin to arrive. Your floor joist is laid

4. First inspection of new construction

5. Completion of shell

Once the floor joist is approved the shell quickly goes up. We make internal partitions. At this stage the shell is insulated.

6. Second inspection of roof refurbishment

7. Remaining work completed

Now it’s time to proceed with tiling, roofing and guttering. All remaining external work is also finished. Electric cables for lights and sockets are laid. At this stage of the process windows go in. Doors and frames are fitted. Internal rooms are ready for partitioning and plastering. We lay your flooring, fireproof the construction and check the guttering is up to the job.

8. Completion Certificate is issued

A final building inspection occurs. After the final inspection you will be issued with a Completion Certificate and a Part P certificate.

The Completion Certificate is your proof that your attic extension is safe and meets local building regulations.

The Part P Certificate proves that electrical work in your attic extension meets safety standards.

You move in. We move on

Our work is now finished. It’s time for you to take over. Furnish your new room to your taste and personalise it however you like.

We leave you with the reassurance of our 10 year guarantee.